PET preform Mould, Cap Mould, Blow Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- Each part of mould's size checking after machining according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping
Plastic products, PET preform, PET jars, PET can, PET Ting quality control
1. Plastic Material Q/C
- make sure material PET is purely new material
- Dry PET material for 4-6 hours before production
2. PET Preform Production Process Q/C
- Plastic injection machine running details checking (machine tempreture, cooling time etc.)
- PET preform mould tempretuer controller checking(tempreture)
3. Random inspection
Check PET preform/can, color, thickness, gate, neck to make sure preform totally according to drawing